Containerised power and cooling modules for data centres
Supplied by Schneider Electric on Thursday, 13 February, 2014
The availability of pre-engineered data centre facility modules allows the planning cycle to switch from an on-site construction focus to on-site integration of pre-tested blocks of power and cooling, resulting in lower cost and faster delivery. These pre-assembled, integrated data centres are also faster to deploy compared to traditional data centres.
This white paper compares the cost of both scenarios and identifies which environment can best leverage the facility module approach.